Tim Couevas

Project Manager

image

About Tim


Tim Couevas has experience and knowledge in the execution and management of construction, boundary, and topographic surveying. He is skilled in the methods, procedures, and processes of all types of land and construction surveying. Mr. Couevas has a Bachelor of Science Degree in Construction Management and has worked in the construction industry for over 19 years, performing for over 8 years as a surveyor. This work includes ALTA Surveys, aerial photo control, boundary surveys, construction staking, Geotracker well surveys, GPS surveys, legal descriptions, lot divisions, parcel and final maps, property line marking, records of survey, subdivision and lot splits, tentative maps, and topographic mapping.


Notable Project Experience



Judy Reservoir to Mount Vernon Transmission Pipeline - Phase 2: Public Utility District No. 1 of Skagit County; Scarsella Bros, Inc.

Mr. Couevas manages all aspects of coordination, scheduling, contracting, and performance of the work and actively participates in on-site survey activities to include control verification, settlement monitoring, site prep staking, water line staking, fiber optic staking, electrical staking, storm staking, slope staking, restoration staking, stream staking, monument replacement, and bridge structure staking. This 5.3-mile-long project consists of the installation of 36” water transmission and distribution piping services within right-of-way and private property within the City of Mount Vernon and unincorporated Skagit County.



E135 Mercer Island Transit Integration - Central Puget Sound Regional Transit Authority; Johansen Construction Company

Mr. Couevas manages all aspects of coordination, scheduling, contracting, and performance of the work. This project is comprised of transit improvements on Mercer Island adjacent to the Sound Transit Station along North Mercer Way, 77th Ave SE, and 80th Avenue SE on Mercer Island. The improvements include: a roundabout at 77th Ave SE and North Mercer Way, additional streetscape modifications along North Mercer Way, and widening of the I-90 pedestrian/bike trail.



Washington State Convention Center Addition: Steel Structure Survey and Verification Survey, City of Seattle; American Bridge Company & KWH Constructors

Mr. Couevas assisted with the coordination, scheduling, contracting, and performance of all survey activities associated with the contract scope. Worked directly with the client and engineers to determine the design location of all steel structure components of the work. Created intelligent integrated data reports to support the client obligations to the owner and engineers. Prepare Steel Structure Survey Procedures Manual in compliance with the project specifications and requirements and provide to client to be used for performance and execution of the work.



West Cashmere Bridge Replacement: WSDOT Scarsella Bros, Inc.

Mr. Couevas assisted with all aspects of coordination, scheduling, contracting, and performance of the work. This project consists of a 3-span full width bridge construction over BNSF ROW and waterways, and full section roadway construction.



Totem Lake Connector Bridge: City of Kirkland; Kraemer NA, LLC

Mr. Couevas assisted with all aspects of coordination, scheduling, contracting, and performance of the work. This project consists of a precast Y-Pier and tubular tie-chord strand bridge structure along with other civil and structural design elements.



Index-Galena Flood Repair: Federal Highway Administration; Goodfellow Bros, LLC

Mr. Couevas assisted with all aspects of coordination, scheduling, contracting, and performance of the work. This work consists of control verification and project limit staking through steep rough-cut terrain, topographic survey and quantity calculations, project/ROW alignment control monumentation installation, civil construction staking, and survey staking for installation of multiple bridge structures and structural wall designs.



DSW3 - Burlington: Amazon; Perlo Construction, LLC

Mr. Couevas assisted with all aspects of coordination, scheduling, contracting, and performance of the work and actively participates in on-site survey activities to include settlement monitoring, construction staking, boundary and ROW verification, construction as-build survey, and FEMA surveys. This project consists of standup concrete building structure, civil site development, ROW improvements, and infrastructure improvements.



Covington Connector - 204th Ave SE & SR 516: City of Covington; Scarsella Bros, Inc.

Mr. Couevas assisted with all aspects of coordination, scheduling, contracting, and performance of the work. This project consists of approximately 1.5 miles of complete ROW & roadway construction to include all civil roadway infrastructure and development.



35th Ave SE - 180th St SE - 152nd St SE (Seattle Hill Road): Snohomish County; Marshbank Construction, Inc.

Mr. Couevas assisted with all aspects of coordination, scheduling, contracting, and performance of the work. This project consists of approximately 2.5 miles of ROW & roadway construction to include all civil roadway infrastructure and development.